

Jozef Dobos
Forum Replies Created
-
Your Name (or Company Name):Â 3D Repo LTDYour Project Title:Â Rebar 4.0: Supply chain made smarterGateway to Research Link:Â https://gtr.ukri.org/projects?ref=94330#/tabOverviewProject Description:Â The management and installation of reinforcing steel (rebar) which is a significant structural part of all concrete pours on any major project is complex with many parties and stakeholders. At each stage in the supply chain, steel is transferred from one company to another what may result in the loss of material identity and the use of material of dubious or unknown origin, and hence of unknown properties and performance. This requires effective management of the supply chain if construction projects are to be delivered on time, on budget and to the required quality with reliable estimation of the amount of embedded carbon within. Rebar 4.0 embraces a collaborative approach from all stakeholders in the reinforcing steel value chain to digitise the whole process. It enables digital compliance checking and delivers a true digital twin representation of the built environment for handover.
Website / Press Links:Â https://github.com/rebar-4-0/94330https://www.burohappold.com/news/digitising-construction-with-rebar-4-0/#https://www.theconstructionindex.co.uk/news/view/new-project-seeks-to-make-rebar-supply-smarterhttps://www.ukcares.com/news/article/10147
-
Your Name (or Company Name): 3D Repo LTDYour Project Title:Â AEC Production Control RoomGateway to Research Link:Â https://gtr.ukri.org/projects?ref=106169Project Description:Â Smart construction planning just got smarter with this NASA-inspired control centre for large-scale projects. Frustrated by the lack of real-time, accessible information from sites, a diverse collaborative from across the industry has developed a sophisticated production control room that can improve decision-making around delivery. The data-powered platform acts as a single source of truth across a complex chain of contractors. Teams can digitally rehearse tasks, spot inefficiencies before they cause delay, and flag safety hazards. It means decisions can be made with certainty, so projects are more likely to be delivered on time, on budget and built as they were designed.
Website / Press Links:Â
Âhttps://tc-catalogue.strongerstories.org/stories/aec-production-control-room/https://www.macegroup.com/media-centre/200722-innovate-uk